Post by Ethan / JRyan on May 14, 2019 18:05:13 GMT -5
10-K
NT 10-Q
My Take on it, for what it is worth...
Important and here is why. Oil WAS encountered but in a non-permeable or without good porosity layer. Hence what Givot had to do, might be the case here as well. I do not know how this would compare with Eagle Ford or the Meged, but nonetheless it is pertinent to what is going on.
GO DEEP
If a scam why would Israel do this? It is a fair question is it not?
I am not a fan of this and here is why. All this does is burn money while the noise attacks. This is NOT what I want to see. It is May - get one with the survey with haste, the most promising areas FIRST, then if at a later date other additional data is needed then cross that bridge then. We CAN NOT spend 2019 waiting. Ife there is more to it, then say so and be frank about it. Tell the lawyers you HAVE to be upfront with the why.
NT 10-Q
My Take on it, for what it is worth...
MJ#1 encountered oil in the Triassic Mohilla formation which Zion believes suggests an active deep petroleum system is in Zion’s license area. There was no natural permeability or porosity in the Triassic Mohilla formation to allow formation fluid to reach the surface naturally during testing and thus the MJ#1 was not producible or commercial.
Important and here is why. Oil WAS encountered but in a non-permeable or without good porosity layer. Hence what Givot had to do, might be the case here as well. I do not know how this would compare with Eagle Ford or the Meged, but nonetheless it is pertinent to what is going on.
As a consequence of seismic remapping, where does the MJ#1 well lie relative to the potential traps at the Jurassic and Triassic levels and was the well location too low on the structures and deeper than the potential hydrocarbons within those traps?
GO DEEP
Zion received a multi-year license extension through December 2, 2020.
If a scam why would Israel do this? It is a fair question is it not?
I am not a fan of this and here is why. All this does is burn money while the noise attacks. This is NOT what I want to see. It is May - get one with the survey with haste, the most promising areas FIRST, then if at a later date other additional data is needed then cross that bridge then. We CAN NOT spend 2019 waiting. Ife there is more to it, then say so and be frank about it. Tell the lawyers you HAVE to be upfront with the why.