Operational Update: Dear followers and supporters of Zion,
I’d like to take this opportunity to give each of you a quick update on our drilling operation. We are well underway on the second stage of the drilling campaign, heading towards the True Vertical Depth of 2,600m (8,530 ft.).
So far, the drilling is going as anticipated with rates of penetration up 50% from stage 1.
The outlook for the next couple of weeks will see the crew navigate through a known zone of difficulty which will slow down the vertical drilling depths as non-drilling services will be utilized to protect the borehole as well as preventing the loss of fluids in this area.
Once the crew passes this particular zone, the drilling rates will continue to rise as we approach the second casing run and cementing operation around the end of the month.